Modular theatre complex completed

Healthcare construction and engineering specialist, MTX, recently completed and handed over a new modular operating theatre complex at Luton and Dunstable University Hospital following a just 29 weeks on site

MTX was awarded the contract to design and build the new facility in July 2015 – the  goal being to provide additional operating theatre and recovery capacity to allow the Trust to remove a temporary hired theatre facility. The project is part of an early phase of construction for a site-wide development. 

The new modular theatre complex, comprising two theatre suites, plus first and second stage recovery and ancillary areas, is on the edge of the site adjacent to the existing theatre department. The new extension was linked into the hospital building via two small ground floor linkways, and has a standalone first floor plant room and external HVAC plant.

Installation of the modules took place via a well-planned operation over two weekends. Full design – including building layout, building specification, and all building services installation and specification – was undertaken by MTX. 

Externally the new building is finished with an easy-to-maintain Plastisol panel system in keeping with the adjacent hospital modular buildings.

More about MTX Contracts Limited

 

Other news

Upcoming Events

Futurebuild 2019

ExCeL, London
5th - 7th March 2019

IHEEM AE Conference 2019

Birmingham
20th March

HEFMA Leadership Forum 2019

Doncaster Racecourse
16th - 17th May

Design In Mental Health conference 2019

Ricoh Arena, CV6 6AQ
21st - 22nd May 2019

Facilities Show 2019

ExCeL, London
18th - 20th June 2019

Latest Issue

Health Estate Journal

Health Estate Journal

Jan 2019

Your medical gas system in safe and expert hands

Register now to apply for regular copies of Health Estate Journal and free access to premium content, as well as our regular newsletters.